{"id":8942,"date":"2022-03-01T17:16:10","date_gmt":"2022-03-01T16:16:10","guid":{"rendered":"https:\/\/dignitynews.eu\/?p=8942"},"modified":"2022-03-01T17:16:10","modified_gmt":"2022-03-01T16:16:10","slug":"poland-lithuania-gas-pipeline-to-operate-on-may-1","status":"publish","type":"post","link":"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/","title":{"rendered":"Poland-Lithuania gas pipeline to operate on May 1"},"content":{"rendered":"<h5><b>The construction of the GIPL gas pipeline, 508 km long connecting the gas transmission systems of Poland and Lithuania has been almost completed. Therefore, the transmission system operators GAZ-SYSTEM SA and AB Amber Grid decided that the partial capacity of this gas pipeline will be available to market participants from May 1. GIPL will reach its full capacity in October 2022.<\/b><\/h5>\n<p><span style=\"font-weight: 400;\">Since May 1, the interrupted capacity for the direction from Lithuania to Poland will amount to 2.4 GWh \/ h, which corresponds to 1.9 billion m3 per year. The capacity for the direction from Poland to Lithuania will be 2.6 GWh \/ h, which corresponds to 2 billion m3 per year.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Initial transmission capacity in both directions will be offered in April 2022 on the GSA Platform, which is an IT tool for reserving gas transmission capacity through the Santaka interconnection (connection point between Poland and Lithuania).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The GIPL project aims to create a two-way gas transmission pipeline connecting the natural gas transmission systems of Poland and Lithuania, which will eliminate the so-called energy islands, i.e. regions not yet integrated with the EU energy market, such as Lithuania, Latvia, Estonia and Finland.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The construction of the gas pipeline is an investment that has the status of a &#8220;Project of Common Interest&#8221; and is co-financed by the European Union under the Connecting Europe Facility (CEF) and the Trans European Networks &#8211; Energy &#8211; TEN-E).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">GAZ-SYSTEM is a strategic company for the Polish economy. It is responsible for the transmission of natural gas and manages the most important gas pipelines in Poland and is the owner of the President Lech Kaczy\u0144ski LNG Terminal in \u015awinouj\u015bcie.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The company is also implementing one of the most important infrastructure projects in Poland &#8211; the Baltic Pipe project, a two-way sea gas pipeline connecting Poland and Denmark; the local transmission network and three gas compressor stations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Adrian Andrzejewski<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction of the GIPL gas pipeline, 508 km long connecting the gas transmission systems of Poland and Lithuania has been almost completed. Therefore, the transmission system operators GAZ-SYSTEM SA&hellip;<\/p>\n","protected":false},"author":3,"featured_media":8867,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_mi_skip_tracking":false,"footnotes":""},"categories":[43],"tags":[],"class_list":["post-8942","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Poland-Lithuania gas pipeline to operate on May 1 - Dignity - DignityNews.eu<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Poland-Lithuania gas pipeline to operate on May 1 - Dignity - DignityNews.eu\" \/>\n<meta property=\"og:description\" content=\"The construction of the GIPL gas pipeline, 508 km long connecting the gas transmission systems of Poland and Lithuania has been almost completed. Therefore, the transmission system operators GAZ-SYSTEM SA&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/\" \/>\n<meta property=\"og:site_name\" content=\"Dignity - DignityNews.eu\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-01T16:16:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dignitynews.eu\/wp-content\/uploads\/2022\/03\/Fot.-GAZ-SYSTEM-S.A..png\" \/>\n\t<meta property=\"og:image:width\" content=\"966\" \/>\n\t<meta property=\"og:image:height\" content=\"571\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"DignityNews.eu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"DignityNews.eu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/dignitynews.eu\/pl\/#website\",\"url\":\"https:\/\/dignitynews.eu\/pl\/\",\"name\":\"Dignity - DignityNews.eu\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/dignitynews.eu\/pl\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/\",\"url\":\"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/\",\"name\":\"Poland-Lithuania gas pipeline to operate on May 1 - Dignity - DignityNews.eu\",\"isPartOf\":{\"@id\":\"https:\/\/dignitynews.eu\/pl\/#website\"},\"datePublished\":\"2022-03-01T16:16:10+00:00\",\"dateModified\":\"2022-03-01T16:16:10+00:00\",\"author\":{\"@id\":\"https:\/\/dignitynews.eu\/pl\/#\/schema\/person\/4d8f570a0fd5c310685d78d9e520982c\"},\"breadcrumb\":{\"@id\":\"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Strona g\u0142\u00f3wna\",\"item\":\"https:\/\/dignitynews.eu\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Poland-Lithuania gas pipeline to operate on May 1\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/dignitynews.eu\/pl\/#\/schema\/person\/4d8f570a0fd5c310685d78d9e520982c\",\"name\":\"DignityNews.eu\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/dignitynews.eu\/pl\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b9fb3aa3cd2d5d3a6d24e67a6b58bc2980bf0c7f7bd3657a6322b8df227da3d9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b9fb3aa3cd2d5d3a6d24e67a6b58bc2980bf0c7f7bd3657a6322b8df227da3d9?s=96&d=mm&r=g\",\"caption\":\"DignityNews.eu\"},\"sameAs\":[\"aleksandra\"],\"url\":\"https:\/\/dignitynews.eu\/en\/author\/aleksandra\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Poland-Lithuania gas pipeline to operate on May 1 - Dignity - DignityNews.eu","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/","og_locale":"en_US","og_type":"article","og_title":"Poland-Lithuania gas pipeline to operate on May 1 - Dignity - DignityNews.eu","og_description":"The construction of the GIPL gas pipeline, 508 km long connecting the gas transmission systems of Poland and Lithuania has been almost completed. Therefore, the transmission system operators GAZ-SYSTEM SA&hellip;","og_url":"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/","og_site_name":"Dignity - DignityNews.eu","article_published_time":"2022-03-01T16:16:10+00:00","og_image":[{"width":966,"height":571,"url":"https:\/\/dignitynews.eu\/wp-content\/uploads\/2022\/03\/Fot.-GAZ-SYSTEM-S.A..png","type":"image\/png"}],"author":"DignityNews.eu","twitter_card":"summary_large_image","twitter_misc":{"Written by":"DignityNews.eu","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/dignitynews.eu\/pl\/#website","url":"https:\/\/dignitynews.eu\/pl\/","name":"Dignity - DignityNews.eu","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dignitynews.eu\/pl\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/","url":"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/","name":"Poland-Lithuania gas pipeline to operate on May 1 - Dignity - DignityNews.eu","isPartOf":{"@id":"https:\/\/dignitynews.eu\/pl\/#website"},"datePublished":"2022-03-01T16:16:10+00:00","dateModified":"2022-03-01T16:16:10+00:00","author":{"@id":"https:\/\/dignitynews.eu\/pl\/#\/schema\/person\/4d8f570a0fd5c310685d78d9e520982c"},"breadcrumb":{"@id":"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/dignitynews.eu\/en\/poland-lithuania-gas-pipeline-to-operate-on-may-1\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Strona g\u0142\u00f3wna","item":"https:\/\/dignitynews.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Poland-Lithuania gas pipeline to operate on May 1"}]},{"@type":"Person","@id":"https:\/\/dignitynews.eu\/pl\/#\/schema\/person\/4d8f570a0fd5c310685d78d9e520982c","name":"DignityNews.eu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/dignitynews.eu\/pl\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b9fb3aa3cd2d5d3a6d24e67a6b58bc2980bf0c7f7bd3657a6322b8df227da3d9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b9fb3aa3cd2d5d3a6d24e67a6b58bc2980bf0c7f7bd3657a6322b8df227da3d9?s=96&d=mm&r=g","caption":"DignityNews.eu"},"sameAs":["aleksandra"],"url":"https:\/\/dignitynews.eu\/en\/author\/aleksandra\/"}]}},"_links":{"self":[{"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/posts\/8942","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/comments?post=8942"}],"version-history":[{"count":1,"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/posts\/8942\/revisions"}],"predecessor-version":[{"id":8943,"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/posts\/8942\/revisions\/8943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/media\/8867"}],"wp:attachment":[{"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/media?parent=8942"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/categories?post=8942"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dignitynews.eu\/en\/wp-json\/wp\/v2\/tags?post=8942"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}